Moving to Beach House

Finally! After 4 years of Air BnB / VRBO problems, it is off market and we are upgrading for move next year.


Had designed a 10kW solar system, with 80kWh @ 48vdc ESS, and 2x 6kW hybrid inverters, all backed up by 4kw inverter generator for some charging if needed. Double checked with county, no permit needed but left my number to be connected with reputable solar installer.


Got call from the county, wanting to confirm my address. After doing so, was informed that the house is located in special protected coastal area and permit WILL be needed. Uh oh. Yup, everything needs UL certs, of which I have none.


The solar system was our response to multiple power events each *week*. And now can't install it right away.


So, my temporary solution is placement of my multiple power stations:

1 R2P on fridge, may add an externally charged battery if usage requires.

1 R3 on Living Room TV entertainment center

1 R3 in SIL bedroom night stand

1 R3 in Living Room between Lazy Boys for lamps and device charging, also does TMo Gateway and Camera NVR

1 D2 in office, supporting 2 desks with load approaching 600w. This will have a pair of EF 12v100Ah batteries (TM) in series connected via XT150 and charged externally

1 D2 in small work shop backing up my tiny PC and 3D printer & desktop CNC. Laser coming too...

1 D2 on microwave/ countertop dishwasher / coffee maker / Toaster oven cart because nothing should interfere with coffee.

1 R2P is at work powering my tool battery chargers and mini fridge.


Still have a spare D2, R2P, and R3. The latter was found while cleaning out garage. I *knew* I had a fourth.


The only thing I can't power is the central 3ton HVAC without using generator.